The New Hampshire DOT has implemented a lane shift on the Spaulding Turnpike both northbound and southbound from mile marker 22.7 to 33.2 in Rochester and Milton for a crack sealing project.
The crack sealing project is expected to take two weeks, weather permitting, and will require lane shifts from 7 a.m. to 4 p.m. during this period.
NHDOT urges drivers to exercise caution while driving through the affected area and to follow all posted signage and speed limits.
Crack sealing is the process of placing an adhesive sealant into cracks on the pavement surface, preventing the infiltration of moisture and non-compressible materials into the pavement.